FREE FUTURES CALCULATORS

From gross movement to net profit or loss

Reproduce a trade example and see how fees, direction and slippage change the answer.

← All calculators

A price move is only the first line of a trade calculation. A useful estimate also states whether the position was long or short, how many contracts were involved, and which costs have already been included. The following prices and charges are fictional planning inputs, not current quotes.

A profitable price move with explicit costs

Assume a long position in two MES contracts entered at 5,000 and exited at 5,002.50. The move is 2.5 points. With a $5 point value, gross profit is 2.5 × $5 × 2 = $25. Assume $2 in round-turn fees per contract and two ticks of total adverse slippage per contract. Slippage costs 2 × $1.25 = $2.50 per contract. Combined costs are ($2 + $2.50) × 2 = $9, leaving an estimated $16 before tax.

Reproduce the result in the tool

  1. Open Profit & loss with MES and choose Long.
  2. Set entry to 5000, exit to 5002.5 and contracts to 2.
  3. Expand Fees & slippage. Enter 2 for round-turn fees and 2 for total slippage ticks.
  4. Open Calculation & contract details to compare the $25 gross, $9 costs and $16 net result.

What changes when the direction is short?

Keep the same entry and exit but select Short. The rising price now produces a $25 gross loss. The same $9 costs still apply, so the estimated result is −$34. Costs do not reverse sign when direction changes. Conversely, a short entered at 5,002.50 and exited at 5,000 has the same $25 gross gain as the first long example.

Avoid counting slippage twice

If entry and exit are actual filled prices, their difference already contains the execution prices you received. Leave the extra slippage field at zero unless you are deliberately adding a further hypothetical cost. If the prices are planned levels, enter total adverse slippage across both sides once. A one-tick allowance on entry plus one tick on exit is two ticks total, not two ticks on each side.

Why the break-even move is not always a whole number

Under this example, costs per contract are $4.50. Dividing by $1.25 gives 3.6 ticks. An outright MES price move uses whole ticks, so a four-tick favorable move is the first whole-tick move that exceeds those assumed costs. This describes one cost scenario, not a prediction of achievable fills. Taxes, funding charges and unentered costs remain outside the result.

Check your understanding

Your entered prices are actual fills. Should you also subtract those same execution differences as slippage?

Reveal the answer

No. That would count the execution difference twice. Use zero extra slippage unless deliberately modeling an additional hypothetical cost.

Sources and review

Original worked examples by Tick and Point. Explanation and example arithmetic reviewed November 8, 2026. CME Group reference supports the contract or margin definitions; hypothetical prices, fees and account amounts are our examples, not exchange quotes. No live margin schedule is verified.

Found a discrepancy? Send a correction with the page, input values, expected result and reference. Read our calculation method and limitations.

Important information · Advice & trading risk

Tick and Point provides general educational information and estimates based on the numbers you enter. We do not provide personalized financial, investment, tax or legal advice, assess suitability, or recommend buying or selling any investment.

Before making trading decisions, speak with a qualified financial professional who understands your circumstances and futures trading.

Futures involve substantial risk. You can lose your initial investment and more. A calculated position size or stop distance does not guarantee a maximum loss.

Results are estimates, not forecasts or guarantees. Check current contract specifications, margin requirements, fees and execution assumptions with your exchange and broker. Costs are included only when entered.

Full disclaimer · CFTC: futures market basics