Margin capacity and a risk budget answer different questions
Compare a deposit requirement with a stop-based estimate using transparent hypothetical inputs.
A broker's margin requirement concerns funds needed to hold a position. A stop-based calculation estimates the loss associated with an entered price distance and costs. Neither number alone establishes whether a position is suitable, and neither guarantees a maximum loss.
Calculate a budget-based contract count
Suppose an educational scenario uses a $100 risk budget, MES, a 20-tick stop, $2 round-turn fees and two total adverse slippage ticks per contract. The stop move is 20 × $1.25 = $25. Entered costs add $2 + (2 × $1.25) = $4.50. The total estimate is $29.50 per contract.
Divide $100 by $29.50 to obtain approximately 3.39. The position-size calculator rounds down to three whole contracts, with an estimated $88.50 loss at the entered assumptions. Four would be $118, above the entered budget. The unused $11.50 is arithmetic headroom, not protection against gaps or an execution beyond the assumed stop.
Check margin independently
For a separate fictional account example, assume $1,000 of available funds and a $200 per-contract requirement. The margin estimator calculates capacity of five contracts and a $600 requirement for three. These are invented amounts to demonstrate multiplication and division; they are not MES margin quotes. If the applicable requirement rose to $400, three would require $1,200 and exceed the assumed funds.
Initial, maintenance and broker schedules
Initial margin applies to establishing a position; maintenance is the ongoing minimum. Brokers can impose additional requirements. Reduced intraday schedules, eligibility and cutoffs vary, so replace the tool's historical samples with the figures applicable to your account and holding period. Do not substitute a maintenance figure for an opening requirement without checking with your broker.
What the two tools cannot tell you
The simple margin calculation does not model other open positions, portfolio offsets or changing equity. The risk-budget calculation does not determine an appropriate stop, recommend a budget, or guarantee execution. Market gaps and liquidation charges can produce a larger loss. A calculated count of zero means the entered assumptions do not cover one contract; it is not an instruction to move a stop or increase a budget.
When checking a discrepancy, record the symbol, contract quantity, time and holding period, the broker requirement used, and whether your balance represents available funds. Compare like with like before treating a difference as a calculator error.
Check your understanding
A margin calculation allows five contracts but the risk-budget scenario allows three. Does margin capacity make five fit the budget?
Reveal the answer
No. Five would exceed that risk budget. Each constraint must be checked separately.
Sources and review
Original worked examples by Tick and Point. Explanation and example arithmetic reviewed November 8, 2026. CME Group reference supports the contract or margin definitions; hypothetical prices, fees and account amounts are our examples, not exchange quotes. No live margin schedule is verified.
Found a discrepancy? Send a correction with the page, input values, expected result and reference. Read our calculation method and limitations.
Important information · Advice & trading risk
Tick and Point provides general educational information and estimates based on the numbers you enter. We do not provide personalized financial, investment, tax or legal advice, assess suitability, or recommend buying or selling any investment.
Before making trading decisions, speak with a qualified financial professional who understands your circumstances and futures trading.
Futures involve substantial risk. You can lose your initial investment and more. A calculated position size or stop distance does not guarantee a maximum loss.
Results are estimates, not forecasts or guarantees. Check current contract specifications, margin requirements, fees and execution assumptions with your exchange and broker. Costs are included only when entered.